Spent several days after moving to the hanger getting organized and all the other stuff moved. I then started the final install of the tail sections. First installed the horzional stablizer and then the vertical stablizer. I first had to remove the ELT, which sits under the VS. Installed both VS and HS and connected the control tube from elevators to the control bellcrank mid aircraft. I also hooked up the rudder cables to the rudder.